A cargo that arrives wetter or dirtier than the contract basis is paid on less weight than was loaded. Enter the gross weight and the lab results and this works out the moisture, foreign matter and handling deductions, the settlement weight and what it does to the invoice.
Inputs
Settlement
Deductions are applied in order: moisture first, then foreign matter on the dried weight, then handling loss on what remains. Some contracts deduct on a different base or by a sliding scale, so follow the clause in your own contract.
Why moisture is settled by weight
Most agricultural commodities are priced at a basis moisture. Water has no value to the buyer and adds weight, so a cargo that tests wetter than basis is paid on the weight it would have had at basis. The moisture factor is the dry matter present divided by the dry matter the basis implies.
A cargo drier than basis would, by the same arithmetic, settle above its gross weight. Most contracts do not allow that, so the factor is capped at 1 unless the credit box is ticked.
Foreign matter and handling loss
Foreign matter is dirt, stones, husk, broken kernels or anything else outside the grade. Contracts set an allowance and deduct only the excess, usually on the weight left after the moisture adjustment.
Handling or drying loss is a further percentage for cleaning, drying or shrink in transit that the contract charges to the seller. It is applied last, on the weight that remains.
Where the numbers come from
Moisture and foreign matter come from the sample drawn at loading or discharge and tested by an independent inspector, and the contract names which result binds. The basis moisture, the allowance and the loss percentage all come from the contract, not from this page.
Worked example
Take 100 tonnes at USD 300 per tonne, with a basis moisture of 14 per cent and a lab result of 16. The moisture factor is 0.84 divided by 0.86, or 0.9767, so the moisture deduction is 2.3256 tonnes and the weight after it is 97.6744 tonnes.
Foreign matter tests at 2.5 per cent against a 2 per cent allowance, so 0.5 per cent of 97.6744 tonnes, 0.4884 tonnes, comes off. A 0.5 per cent handling loss on the remaining 97.1860 tonnes takes off another 0.4859 tonnes.
The settlement weight is 96.7001 tonnes, a total deduction of 3.2999 tonnes or 3.30 per cent. The invoice moves from USD 30,000 to USD 29,010.03, a reduction of USD 989.97.
Questions
What is a moisture factor?
The dry matter in the cargo at its actual moisture divided by the dry matter it would hold at the contract basis. At 16 per cent moisture against a 14 per cent basis it is 0.84 divided by 0.86, or 0.9767.
Is cargo drier than basis paid a premium?
Only if the contract says so. Most cap the factor at 1, so a dry cargo is paid on its gross weight. The credit box in the calculator switches the cap off.
Is foreign matter deducted in full or only above the allowance?
Only the excess over the allowance in most contracts. At 2.5 per cent foreign matter and a 2 per cent allowance, the deduction is 0.5 per cent of the weight.
Why is handling loss applied last?
Because it is a percentage of the weight that is left after the cargo has been dried and cleaned in the settlement. Applying it to gross weight would deduct the same material twice.
Which result binds, the origin sample or the destination sample?
Whichever the contract names. Many contracts settle on the discharge result, some on the loading result, and some average the two or send disputes to an umpire sample. Read the quality clause before you rely on a figure.
Other free trade tools
HS code lookup
Search Harmonized System headings, packing norms, contract forms and destination limits across every commodity we quote.
Container loading calculator
Work out how many bags, cartons, drums or big bags fit a container, and whether the load is weight limited or volume limited.
Landed cost calculator
Build a full import cost from unit price through freight, duty and VAT to a cost per tonne you can price against.
Commodity unit and price converter
Convert between tonnes, short tons, long tons, pounds, bags and drums, and restate a price on any of those bases.
Incoterms cost split
See who pays each leg of a shipment and where the risk passes under each of the eleven Incoterms 2020 rules.
Laytime and demurrage calculator
Work out laytime allowed and used, time on demurrage or saved, and the demurrage or despatch due on a voyage charter.
Request a SIP price
Settlement weight is only half the deal. Tell us the commodity, the basis and the window and we will put a price on it.